AD-ET’S WORLDWIDE EXPERIENCE

AD-ET’s expertise comes from a large number of projects developed all around Europe, North Africa and Middle East. Different environments, both greenfield and brownfield designs, have contributed to enrich our professional background, allowing us to develop the ability of dealing with every level of project complexity.

Milano Malpensa Airport Milano, Italy
2023 – now Conceptual and construction design for the new baggage handling system (BHS) arrival lines, within the context of the Terminal 1 expansion at Milan Malpensa Airport.
System value: TBD
“Valerio Catullo” Airport Verona, Italy 2023 – now Construction Design and works supervision for the new arrival lines.
System value: 300.000 €
“Falcone e Borsellino” Airport Palermo, Italy 2023 – now Works supervision for the construction of new baggage handling system. System value: 8.700.000 €
“Marco Polo” Airport Venezia, Italy 2021 - now Conceptual design of the new baggage handling system (BHS) and implementation of Standard 3, as part of the expansion and refurbishment project at Venice "Marco Polo" Airport. System value: TBD
“Cristoforo Colombo” Airport Genova, Italy 2019 - now Detail design and work supervision for the new BHS as part of the expansion of Genoa Airport.
System Value: 2.100.000 €
Aéroport « Roland Garros » Saint-Denis, Ile de la Réunion, France 2018 - now
Conceptual, final, and construction design, along with supervision of the works for the new baggage handling system (BHS) and the implementation of Standard 3, within the framework of the expansion and refurbishment of Saint Denis 'Roland Garros' Airport. System value: 15.000.000 €
More Details
Military Airport
Pratica di Mare, Italy
2023
Detailed design of the new cargo area and new BHS with Standard 3 implementation.
System value: 1.300.000 €

“Tito Minniti” Airport
Reggio Calabria, Italy

2022 – 2023

Detailed design, construction design of the new BHS with Standard 3.
System value: 2.300.000 €

“Salento” Airport
Brindisi, Italy

2020 – 2023

Detailed design, construction design of the new BHS with Standard 3.

System value: TBD

More Details
“Karol Wojtyla” Airport

Bari, Italy

2020 – 2023

Detailed design, construction design of the new BHS with Standard 3.

System value: TBD

More Details
Riga International Airport

Riga, Latvia

2018-2023

Conceptual and construction design for the new baggage handling system (BHS) and the implementation of Standard 3, within the scope of the expansion and refurbishment of Riga International Airport.

System value: 14.400.000 €

More Details
Riga International Airport

Riga, Latvia

2019-2020

Construction design for the new BHS system inside the existing building with the implementation of Standard 3.

System value: 4.500.000 €

Milano Malpensa Airport

Milano, Italy

2019-2020

Conceptual and detail design for the new baggage handling system (BHS) arrival lines, within the context of the Terminal 1 expansion at Milan Malpensa Airport.

System value: 5.200.000 €

“Costa Smeralda” Airport

Olbia, Italy

2018

Concept design for the new BHS and implementation of Standard 3

System value: 8.000.000 €

“Cristoforo Colombo” Airport

Genova, Italy

2018 – 2019

Conceptual design, detail design and work supervision for the new baggage handling system.

System value: 1.800.000 €

“Marco Polo” Airport

Venezia, Italy

2016-2018

Construction design of the new baggage handling system (BHS) and implementation of Standard 3, as part of the expansion and refurbishment project at Venice "Marco Polo" Airport.

System value: 39.900.000 €

More Details
“Valerio Catullo” Airport

Verona, Italy

2015

Conceptual design of the new baggage handling system (BHS) and implementation of Standard 3,

System value: 10.000.000 €

“Marco Polo” Airport

Venezia, Italy

2014-2015

Conceptual design of the new baggage handling system (BHS) and implementation of Standard 3, as part of the expansion and refurbishment project at Venice "Marco Polo" Airport.

System value: 39.900.000 €

Aéroport International de Genève

Genève, Switzerland

2013

Conceptual design and evaluation of different technical solutions for the new BHS.